Post-Construction Cleaning Checklist: Rough, Final and Touch-Up

4.9 on Google · 52 reviews Women-owned · Miami-Dade & Broward

Ayamey cleaner wiping windows in an empty commercial room
In short

Post-construction cleaning is usually done in three phases: a rough clean to remove debris and heavy dust while work is still finishing, a final clean of every surface, fixture, window and floor, and a touch-up right before inspection or move-in. Working top to bottom keeps dust from falling on surfaces that are already clean.

1. Rough clean

  • Remove light debris and packaging
  • Sweep and vacuum floors
  • Remove heavy dust from surfaces
  • Clear windows of tape and stickers

2. Final clean

  • High dusting: vents, fans, tops of doors and frames
  • Cabinets and drawers inside and out
  • Fixtures, appliances and hardware
  • Windows, frames and tracks
  • Baseboards and doors
  • Floors cleaned for their finish

3. Touch-up

  • Final dust that settled after the last trades
  • Glass and mirrors
  • Restrooms
  • Walk-through with the client or inspector

Tips for contractors

Schedule the final clean after the last trade leaves and before furniture or tenants move in. Tell the cleaning team which surfaces have new finishes so they use the right products.

Last updated: · By Ayamey Multiservice LLC, Miami Gardens, FL.

FAQ

Frequently asked questions

Don’t see your question? Call or WhatsApp (305) 522-5111 and Delia’s team will answer.

When should post-construction cleaning be scheduled?

The final clean should happen after all trades are done and before inspection, furniture or move-in, with a short touch-up right before the handover.

Tell us about your space. We’ll build the cleaning plan.

Call, WhatsApp or send a quick request. Businesses get a walkthrough; hosts and homeowners get a quote based on the property.